Yes, you can build an ADU in Hacienda Heights. It is unincorporated, so Los Angeles County rules apply: a detached ADU can be up to 1,200 square feet and 25 feet tall, set 4 feet from the side and rear property lines. Lots in the Puente Hills fire zone have extra rules.
Enter your address to find your property, explore your lot and view the plans that may fit it.
Hacienda Heights has no city government. Los Angeles County Planning reviews ADUs here, against written rules and with no public hearing.
The community splits in two. North of the hills, flat tract lots from the 1950s and 1960s follow the standard county rules, with no ADU parking required. To the south, streets climb into the Puente Hills, and many of those lots are in a Very High Fire Hazard Severity Zone. There the county requires two ways out to a highway, can require one parking space, and slope and paved access shape what fits. Hacienda Heights also has its own Community Standards District, which can lower the height limit.
Neighbors work differently. Whittier and Industry are cities with their own ADU rules, and both hold detached ADUs to 16 ft in most cases, where the county allows up to 25 ft.
A single-family lot can have one ADU inside or attached to the house, one detached ADU and one Junior ADU. Size limits can be smaller when you combine them.
How big can an ADU be in Hacienda Heights? Up to 1,200 sq ft detached. An attached ADU can be up to half the size of the main house or 1,200 sq ft, whichever is less. Larger hillside lots often have the room, but slope and fire access decide where the unit can go.
How tall? Up to 25 ft, or lower where the Hacienda Heights Community Standards District sets a lower limit.
Setbacks? 4 ft from the side and rear property lines, and 6 ft between buildings. Conversions keep their existing setbacks.
Parking? None outside a Very High Fire Hazard Severity Zone. Inside one, one uncovered space unless an exemption applies.
You apply online through EPIC-LA, the county's permit system. County Planning reviews zoning first, then Building and Safety reviews the construction plans. Puente Hills lots often need grading and soils reports, plus fire department review of access.
State law gives the county 60 days to approve or deny a complete ADU application. Hillside and fire zone reviews add time.
Any Hacienda Heights lot zoned for a house or apartments can have an ADU, as long as a legal home exists or is proposed.
ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.
ADU rules change often. This page is a general guide to help you get a sense of what may be possible where you live. It is not legal, zoning or permitting advice, it is no substitute for working with a qualified ADU professional, and it is not a promise that any project will be approved. We update these summaries as often as we can, but your city or county has the final say, and its current code always controls. Before you design, budget or build, confirm the requirements for your property with your local planning and building department.