Industry

Industry ADU Rules and Requirements (2026)

ADUs are rarely possible in the City of Industry. The city is almost entirely industrial and commercial, with very few homes. Where a legal home exists, the city's code allows an ADU of 850 square feet, or 1,000 square feet with more than one bedroom, 16 feet tall, set 4 feet from the side and rear property lines.

San Gabriel Valley
Last reviewed
November 20, 2026

At a glance

Largest detached ADU
850 to 1,000 sq ft
Height limit
16 ft, up to 18 ft
Side and rear setback
4 ft
Parking
1 space unless exempt
Permit review
60 days (state limit)

See what fits on your lot

Enter your address to find your property, explore your lot and view the plans that may fit it.

Check your property
Overview of rules in Industry

The City of Industry was set up as a place for business. It has a few hundred residents and only a small number of houses, many of them not privately owned.

State ADU law applies wherever a legal home sits on land where housing is allowed. The figures on this page come from Chapter 17.80 of the City of Industry Municipal Code, read in November 2026. If you own a home here, start by checking with the city how your lot is zoned and what local limits apply. If you are near Industry but not in it, your home is more likely in La Puente, Hacienda Heights, Rowland Heights, Valinda or another neighbor, each with its own rules.

ADU Types Allowed

  • Conversion ADU: existing space in or beside a legal home turned into a separate home.
  • Detached or attached ADU: possible only on a lot where housing is allowed.
  • Junior ADU: up to 500 square feet inside a single-family home. The owner must live on the property if the Junior ADU shares a bathroom with the house.

Key ADU Regulations

How big can an ADU be in the City of Industry? 850 sq ft for a studio or one bedroom, or 1,000 sq ft with more than one bedroom, and no more than half the size of the main house. An ADU of up to 800 sq ft is always allowed.

How tall? 16 ft for a detached ADU, or 18 ft within half a mile of major transit. An attached ADU can be 25 ft or the height limit for the house, whichever is lower, and two stories at most.

Setbacks? 4 ft from the side and rear property lines. Conversions keep their existing setbacks.

Parking? One space per ADU or per bedroom, whichever is less, and it can be tandem on the driveway. None is required in the cases state law lists, such as conversions and homes within half a mile of public transit.

Permit Requirements

Contact the City of Industry's planning staff first to confirm that your property qualifies. Building permits follow the usual plan review.

Timeline for Permits

State law gives the city 60 days to approve or deny a complete ADU application.

Zoning and Lot Requirements

Most land in the City of Industry is zoned for industry and commerce, where ADUs are not allowed.

  • Confirm your zoning and that your home is a legal residence.
  • Confirm which city or unincorporated community your address is actually in.
Get Help Navigating ADU Rules in Industry

ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.

On this page
OverviewADU types allowedKey regulationsPermit requirementsPermit timelineZoning and lot requirementsOfficial resources
See what fits on your lot
Enter your address to check what you can build on your property.
Check your property

Our work

See more
See ADU rules for all cities
Close

Check your property

Enter your address to see your lot and the plans that may fit it.

Get your ADU now

Get Free Estimate  →