Seacliff

Seacliff ADU Rules and Requirements (2026)

Yes, you can build an ADU in Seacliff. Seacliff is unincorporated, so Santa Cruz County rules apply: a new ADU can be up to 850 square feet, or 1,000 square feet with two or more bedrooms, set 4 feet from the side and rear property lines. Because it is on the coast, a new ADU always needs a parking space.

Santa Cruz County
Last reviewed
November 20, 2026

At a glance

Largest detached ADU
850 to 1,200 sq ft
Height limit
16 ft
Side and rear setback
4 ft
Parking
1 space, always (coastal)
Permit review
60 days (state limit)

See what fits on your lot

Enter your address to find your property, explore your lot and view the plans that may fit it.

Check your property
Overview of rules in Seacliff

Seacliff has no city government. It is part of Aptos, and Santa Cruz County reviews ADUs here.

Seacliff sits on the bluffs above Seacliff State Beach, inside the Coastal Zone. The county treats the Aptos coast as an area where a new ADU always needs one parking space, and where parking lost to a garage conversion must be replaced. Lots are small and streets are narrow, so fitting that space is often the hardest part. Bluff-top lots face added coastal and geologic review.

ADU Types Allowed

  • Detached ADU: a new, separate building on the lot.
  • Attached ADU: an addition to the main house.
  • Conversion ADU: a garage or other existing space turned into a home, with no size limit.
  • Junior ADU: 150 to 500 square feet inside a single-family home. The owner must live on the property if the Junior ADU shares a bathroom with the house.

Key ADU Regulations

How big can an ADU be in Seacliff? Seacliff's lots are almost all under an acre, so the limit for a new detached ADU is 850 sq ft for a studio or one bedroom, or 1,000 sq ft with two or more bedrooms. On lots of one acre or more, 1,200 sq ft detached.

How tall? Inside the county's Urban Services Line, which covers Seacliff, 16 ft for a detached ADU.

Setbacks? 4 ft from the side and rear property lines. Bluff-top lots have added setbacks.

Parking? One space for a new ADU, always. If you convert a garage, the lost parking must be replaced.

Permit Requirements

Most ADUs need only a building permit, filed through the county's online plan review system. Coastal Zone lots can need added review.

Timeline for Permits

State law gives the county 60 days to approve or deny a complete ADU application. Coastal review adds time.

Zoning and Lot Requirements

Any Seacliff lot zoned for a house can have an ADU, as long as a legal home exists or is proposed.

  • Coastal Zone: parking and review rules are stricter.
  • Bluffs: geologic rules limit where you can build.
  • Short-term rentals are not allowed in an ADU.
Get Help Navigating ADU Rules in Seacliff

ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.

On this page
OverviewADU types allowedKey regulationsPermit requirementsPermit timelineZoning and lot requirementsOfficial resources
See what fits on your lot
Enter your address to check what you can build on your property.
Check your property

Our work

See more
See ADU rules for all cities
Close

Check your property

Enter your address to see your lot and the plans that may fit it.

Get your ADU now

Get Free Estimate  →