San Leandro

San Leandro ADU Rules and Requirements (2026)

Yes, you can build an ADU in San Leandro. An ADU can be up to 1,200 sq ft with conditions, a detached ADU can be 16 ft tall, and side and rear setbacks are 4 ft.

Alameda County
Last reviewed
November 20, 2026

At a glance

Largest detached ADU
1,200 sq ft
Height limit
16 ft, up to 18 ft
Side and rear setback
4 ft
Parking
1 space max, often waived
Permit review
60 days (state limit)

See what fits on your lot

Enter your address to find your property, explore your lot and view the plans that may fit it.

Check your property
Overview of rules in San Leandro

The City of San Leandro reviews ADU permits. The figures on this page come from the city's ADU handout dated October 2025. It allows up to 1,200 sq ft, with added requirements as the ADU gets larger. A single-family lot can have one attached ADU, one detached ADU and one Junior ADU.

ADU Types Allowed

  • Detached ADU: a separate building on the same lot as the house.
  • Attached ADU: an addition to the house.
  • Conversion ADU: built inside existing space, such as a garage.
  • Junior ADU: 150 to 500 sq ft inside the house. The owner must live on the property if the Junior ADU shares a bathroom with the house.

A single-family lot can have one attached ADU, one detached ADU and one Junior ADU.

Key ADU Regulations

How big can an ADU be in San Leandro?

Up to 1,200 sq ft, and at least 150 sq ft. ADUs over 800 sq ft must meet the lot's coverage and floor area limits. ADUs over 850 sq ft must also have two or more bedrooms. ADUs over 1,000 sq ft cannot be more than 50% of the size of the main house.

How tall?

16 ft for a detached ADU, or 18 ft within half a mile of certain transit stops such as BART. An attached ADU can be 25 ft.

Setbacks?

4 ft from the side and rear property lines. Front and corner-side setbacks follow the zone, generally 10 to 20 ft. Conversions keep their existing setbacks.

Parking?

State rule: one space at most, and none for conversions, Junior ADUs or homes within half a mile of public transit. A draft city handout dated October 2025 says no added or replacement parking is required, so confirm with the city.

Permit Requirements

An ADU in San Leandro needs a building permit from the city. A typical application includes:

  • Site plan with property lines, existing buildings and setbacks
  • Floor plans, elevations and structural details
  • Title 24 energy documents

Timeline for Permits

State law gives the city 60 days to approve or deny a complete ADU application. Corrections and resubmittals add time.

Zoning and Lot Requirements

ADUs are allowed on lots with an existing or proposed home.

  • State law does not allow a minimum lot size for ADUs.
  • A Junior ADU shares utilities with the main house.
  • Lot coverage and floor area limits apply once the ADU is over 800 sq ft.
Get Help Navigating ADU Rules in San Leandro

ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.

On this page
OverviewADU types allowedKey regulationsPermit requirementsPermit timelineZoning and lot requirementsOfficial resources
See what fits on your lot
Enter your address to check what you can build on your property.
Check your property

Our work

See more
See ADU rules for all cities
Close

Check your property

Enter your address to see your lot and the plans that may fit it.

Get your ADU now

Get Free Estimate  →