San Dimas

San Dimas ADU Rules and Requirements (2026)

Yes, you can build an ADU in San Dimas. A detached ADU can be up to 850 square feet with one bedroom or 1,000 square feet with two or more, set 4 feet from the side and rear property lines.

San Gabriel Valley
Last reviewed
November 20, 2026

At a glance

Largest detached ADU
850 to 1,000 sq ft
Height limit
16 ft
Side and rear setback
4 ft
Parking
None required
Permit review
60 days (state limit)

See what fits on your lot

Enter your address to find your property, explore your lot and view the plans that may fit it.

Check your property
Overview of rules in San Dimas

San Dimas reviews ADUs against written standards, with no public hearing. The rules are in Chapter 18.38 of the San Dimas Municipal Code.

The city expects an ADU's architecture to match the main house. San Dimas also has horse properties, hillside neighborhoods in the north, and many areas governed by specific plans, each of which can add rules about where a new building goes. The house must be finished before the ADU can be signed off.

ADU Types Allowed

  • Detached ADU: a new, separate building on the lot.
  • Attached ADU: an addition to the main house.
  • Conversion ADU: a garage or other existing space turned into a home.
  • Junior ADU: up to 500 square feet inside a single-family home. The owner must live on the property if the Junior ADU shares a bathroom with the house.

A single-family lot can have one ADU and one Junior ADU.

Key ADU Regulations

How big can an ADU be in San Dimas? Up to 850 sq ft for a studio or one bedroom. Up to 1,000 sq ft with more than one bedroom. The minimum is 150 sq ft.

How tall? State law allows 16 ft for a detached ADU, and 18 ft near major transit.

Setbacks? 4 ft from the side and rear property lines. Conversions keep their existing setbacks.

Parking? None required. San Dimas Municipal Code Chapter 18.38 says no added parking is required for an ADU, and the city's 2025 brochure says the same while encouraging it.

Permit Requirements

You apply to the San Dimas Community Development Department. The city's ADU requirements handout lists what plans must show, including how the ADU gets water and power.

Timeline for Permits

State law gives the city 60 days to approve or deny a complete ADU application. Corrections and resubmittals add time.

Zoning and Lot Requirements

ADUs are allowed where single-family homes are allowed, and on multifamily lots.

  • Design: the ADU must match the main house's architectural style.
  • Horse properties and hillsides: added placement rules can apply.
  • Specific plans: check which plan covers your neighborhood.
Get Help Navigating ADU Rules in San Dimas

ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.

On this page
OverviewADU types allowedKey regulationsPermit requirementsPermit timelineZoning and lot requirementsOfficial resources
See what fits on your lot
Enter your address to check what you can build on your property.
Check your property

Our work

See more
See ADU rules for all cities
Close

Check your property

Enter your address to see your lot and the plans that may fit it.

Get your ADU now

Get Free Estimate  →