Ross

Ross ADU Rules and Requirements (2026)

Yes, you can build an ADU in Ross. An ADU can be up to 800 square feet with one bedroom or 1,000 square feet with two, set 4 feet from the side and rear property lines. A detached ADU can be 18 feet tall.

Marin County
Last reviewed
November 19, 2026

At a glance

Largest detached ADU
800 to 1,000 sq ft
Height limit
18 ft
Side and rear setback
4 ft
Parking
1 space unless exempt
Permit review
60 days (state limit)

See what fits on your lot

Enter your address to find your property, explore your lot and view the plans that may fit it.

Check your property
Overview of rules in Ross

Ross approves an ADU that meets its written standards with no public hearing. Anything beyond those standards, such as more size or height, needs a discretionary ADU Exception Permit.

Ross is small, wooded and protective of its character, and most building projects here go through design review. ADUs are the exception, as long as you stay inside the written limits. Lots near Corte Madera Creek are in a flood zone, and hillside lots bring tree and slope questions.

ADU Types Allowed

  • Detached ADU: a new, separate building on the lot.
  • Attached ADU: an addition to the main house.
  • Conversion ADU: a garage or other existing space turned into a home.
  • Junior ADU: up to 500 square feet, allowed on any single-family lot with a main house. The owner must live on the property if the Junior ADU shares a bathroom with the house.

Key ADU Regulations

How big can an ADU be in Ross? Up to 800 sq ft with one bedroom or less, or 1,000 sq ft with two bedrooms, attached or detached. Two bedrooms is the maximum. Up to 1,200 sq ft is possible with an ADU exception, which comes with a rent restriction for very low-income tenants.

How tall? 18 ft for a detached ADU and 25 ft for an attached ADU. More height needs an ADU Exception Permit.

Setbacks? 4 ft from the side and rear property lines, and 3 ft between a detached ADU and other buildings.

Parking? One space, which can be tandem on the driveway. None for conversions or homes within half a mile of public transit.

Permit Requirements

You apply to the Town of Ross Building and Planning Department. An ADU inside the written limits gets a staff-level review. An ADU Exception Permit is a separate, discretionary application.

Timeline for Permits

State law gives the town 60 days to approve or deny a complete application for an ADU that meets the written standards. Exception permits take longer.

Zoning and Lot Requirements

Any Ross lot in a single-family zone with a main house can have an ADU.

  • Flood zones: lots near the creek may need raised floors.
  • Trees: protected trees limit where you can build.
  • Hillsides: slope and fire access limit what fits.
Get Help Navigating ADU Rules in Ross

ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.

On this page
OverviewADU types allowedKey regulationsPermit requirementsPermit timelineZoning and lot requirementsOfficial resources
See what fits on your lot
Enter your address to check what you can build on your property.
Check your property

Our work

See more
See ADU rules for all cities
Close

Check your property

Enter your address to see your lot and the plans that may fit it.

Get your ADU now

Get Free Estimate  →