Pico Rivera ADU Rules and Requirements (2026)

Yes, you can build an ADU in Pico Rivera. A detached ADU can be up to 1,000 sq ft, 16 ft tall and one story, with 4 ft side and rear setbacks. The city also offers pre-approved ADU plans.

Central and Southeast LA
Last reviewed
November 19, 2026

At a glance

Largest detached ADU
1,000 sq ft
Height limit
16 ft
Side and rear setback
4 ft
Parking
1 space, often waived
Permit review
60 days (state limit)

See what fits on your lot

Enter your address to find your property, explore your lot and view the plans that may fit it.

Check your property
Overview of rules in Pico Rivera

The City of Pico Rivera reviews ADU permits through its Community and Economic Development Department. The figures on this page come from the city's ADU and Junior ADU Regulations handout, revised in January 2026.

Pico Rivera has pre-approved plans for new detached ADUs. They still go through plan check, but the design work is already done.

ADU Types Allowed

  • Detached ADU: a separate building on the same lot as the house.
  • Attached ADU: an addition to the house.
  • Conversion ADU: built inside existing space, such as a garage.
  • Junior ADU: up to 500 sq ft inside the house. The owner must live on the property if the Junior ADU shares a bathroom with the house.

A single-family lot can have one ADU and one Junior ADU.

Key ADU Regulations

How big can an ADU be in Pico Rivera?

A detached ADU can be up to 1,000 sq ft. An attached ADU can be up to 50% of the main house, and 800 sq ft is always allowed. An ADU under 800 sq ft does not count against lot coverage.

How tall?

16 ft and one story for a detached ADU. An attached ADU can be 24 ft or the zone's height limit, whichever is lower. State rule: 18 ft for a detached ADU near major transit.

Setbacks?

4 ft from the side and rear property lines.

Parking?

One space per ADU or per bedroom, whichever is less, and it can be tandem in the driveway. None is required within half a mile of transit, in a historic district, for conversions, or within a block of a car share.

Permit Requirements

An ADU in Pico Rivera needs a building permit and plan check. Expect to provide:

  • Site plan with lot size, lot coverage, zoning and setbacks
  • Floor plans, elevations and construction documents
  • An address assignment letter for the new unit

Timeline for Permits

State law gives the city 60 days to approve or deny a complete ADU application. Corrections and resubmittals add time.

Zoning and Lot Requirements

ADUs are allowed on lots with an existing or proposed home.

  • State law does not allow a minimum lot size for ADUs.
  • Rentals must be for longer than 30 days.
  • A Junior ADU needs a recorded deed restriction.
Get Help Navigating ADU Rules in Pico Rivera

ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.

On this page
OverviewADU types allowedKey regulationsPermit requirementsPermit timelineZoning and lot requirementsOfficial resources
See what fits on your lot
Enter your address to check what you can build on your property.
Check your property

Our work

See more
See ADU rules for all cities
Close

Check your property

Enter your address to see your lot and the plans that may fit it.

Get your ADU now

Get Free Estimate  →