Pacific Palisades

Pacific Palisades ADU Rules and Requirements (2026)

Yes, you can build an ADU in Pacific Palisades under City of Los Angeles rules, but hillside fire and coastal rules limit many lots. Where allowed, a detached ADU can be up to 1,200 square feet and two stories, set 4 feet from the side and rear property lines.

Westside
Last reviewed
November 20, 2026

At a glance

Largest detached ADU
1,200 sq ft
Height limit
Two stories
Side and rear setback
4 ft
Parking
1 space, with exemptions
Permit review
60 days (state limit)

See what fits on your lot

Enter your address to find your property, explore your lot and view the plans that may fit it.

Check your property
Overview of rules in Pacific Palisades

Pacific Palisades follows the City of Los Angeles ADU rules. City staff review plans against the written rules, with no public hearing.

Three things shape what you can build here. Many lots are hillside lots in a Very High Fire Hazard Severity Zone, where the city restricts new ADUs. Much of the area is in the coastal zone, where a coastal development permit may be needed. And rebuilding after the 2025 Palisades Fire follows its own city process, so ask the city how it applies to your lot.

See our Los Angeles ADU rules page for the full citywide guide.

ADU Types Allowed

  • Detached ADU: a new, separate building on the lot.
  • Attached ADU: an addition to the main house.
  • Conversion ADU: a garage or other existing space turned into a home.
  • Junior ADU: up to 500 square feet inside a single-family home. The owner must live on the property if the Junior ADU shares a bathroom with the house.
  • Movable Tiny House: 150 to 430 square feet, behind the main house.

Key ADU Regulations

How big can an ADU be in Pacific Palisades? Up to 1,200 sq ft detached. An attached ADU can be up to half the size of the main house, capped at 1,200 sq ft. For owners rebuilding after the 2025 Palisades Fire, an ADU can be part of the rebuild, so ask the city how its rebuild process applies to your lot.

How tall? Up to two stories, within your zone's height limit. Coastal Zone lots can face added height and view review.

Setbacks? 4 ft from the side and rear property lines. Conversions need no added setback.

Parking? One space, with exemptions near transit and for conversions. Hillside fire zone lots can be required to provide one.

Permit Requirements

Permits go through the Los Angeles Department of Building and Safety (LADBS). You will need a site plan, floor plans, structural drawings and energy code documents. Hillside lots often need grading and soils reports, and coastal lots may need a coastal development permit.

Timeline for Permits

State law gives Los Angeles 60 days to approve or deny a complete ADU application. Hillside, coastal and fire rebuild reviews add time.

Zoning and Lot Requirements

Any Pacific Palisades lot zoned for homes can be considered for an ADU. There is no minimum lot size.

  • Hillside and fire zones: ADUs are restricted on lots in both a Hillside Area and a Very High Fire Hazard Severity Zone, with exceptions for conversions and for lots that meet fire sprinkler, parking and street width conditions.
  • Coastal zone: a coastal development permit may be required.
  • Look up your lot on ZIMAS, the city's zoning map, to see its overlays.
Get Help Navigating ADU Rules in Pacific Palisades

ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.

On this page
OverviewADU types allowedKey regulationsPermit requirementsPermit timelineZoning and lot requirementsOfficial resources
See what fits on your lot
Enter your address to check what you can build on your property.
Check your property

Our work

See more
See ADU rules for all cities
Close

Check your property

Enter your address to see your lot and the plans that may fit it.

Get your ADU now

Get Free Estimate  →