Newark

Newark ADU Rules and Requirements (2026)

Yes, you can build an ADU in Newark. A detached ADU can be up to 1,200 sq ft and an attached ADU up to 1,000 sq ft, with 4 ft side and rear setbacks and no parking required.

Alameda County
Last reviewed
November 20, 2026

At a glance

Largest detached ADU
1,200 sq ft
Height limit
16 ft, up to 18 ft
Side and rear setback
4 ft
Parking
None required
Permit review
60 days (state limit)

See what fits on your lot

Enter your address to find your property, explore your lot and view the plans that may fit it.

Check your property
Overview of rules in Newark

The City of Newark reviews ADU permits. The rules are in Section 17.26.040 of the Newark Municipal Code, amended by Ordinance 563 in February 2026. Most ADUs need only a building permit. A second-story addition taller than 16 ft needs design review. Newark also has a pre-approved ADU program.

ADU Types Allowed

  • Detached ADU: a separate building on the same lot as the house.
  • Attached ADU: an addition to the house.
  • Conversion ADU: built inside the house or an existing accessory structure.
  • Junior ADU: up to 500 sq ft inside the house. The owner must live on the property if the Junior ADU shares a bathroom with the house.

A single-family lot can have one ADU and one Junior ADU.

Key ADU Regulations

How big can an ADU be in Newark?

A detached ADU can be up to 1,200 sq ft. An attached ADU can be up to 1,000 sq ft.

How tall?

16 ft for a detached ADU, or 18 ft within half a mile of major transit or on a lot with a multistory multifamily building, under Ordinance No. 563. State rule: up to 25 ft for an attached ADU. In Newark, a second-story addition taller than 16 ft needs design review.

Setbacks?

4 ft from the side and rear property lines, and 4 ft from the street side on a corner lot.

Parking?

None required for an ADU or Junior ADU. Garage parking removed for an ADU does not have to be replaced.

Permit Requirements

An ADU in Newark needs a building permit from the Building Inspection Division. A typical application includes:

  • Site plan with property lines and setbacks
  • Floor plans, elevations and structural details
  • Title 24 energy documents

Timeline for Permits

State law gives the city 60 days to approve or deny a complete ADU application. Corrections and resubmittals add time.

Zoning and Lot Requirements

ADUs are allowed in any zone that allows homes, on single-family and multifamily lots.

  • State law does not allow a minimum lot size for ADUs.
  • ADUs under 750 sq ft do not pay impact fees.
  • ADUs larger than 800 sq ft must meet the objective standards in the Municipal Code.
Get Help Navigating ADU Rules in Newark

ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.

On this page
OverviewADU types allowedKey regulationsPermit requirementsPermit timelineZoning and lot requirementsOfficial resources
See what fits on your lot
Enter your address to check what you can build on your property.
Check your property

Our work

See more
See ADU rules for all cities
Close

Check your property

Enter your address to see your lot and the plans that may fit it.

Get your ADU now

Get Free Estimate  →