Montebello

Montebello ADU Rules and Requirements (2026)

Yes, you can build an ADU in Montebello. A detached ADU can be up to 1,200 sq ft and 16 ft tall, with 4 ft side and rear setbacks.

Central and Southeast LA
Last reviewed
November 19, 2026

At a glance

Largest detached ADU
1,200 sq ft
Height limit
16 ft, up to 18 ft
Side and rear setback
4 ft
Parking
1 space, often waived
Permit review
60 days (state limit)

See what fits on your lot

Enter your address to find your property, explore your lot and view the plans that may fit it.

Check your property
Overview of rules in Montebello

The City of Montebello reviews ADU permits through its Planning Division and Building and Safety Division. The figures on this page come from the city's ADU Quick Fact Sheet dated October 2025. Cities update their ADU rules often, so confirm current figures with the city.

ADU Types Allowed

  • Detached ADU: a separate building on the same lot as the house.
  • Attached ADU: an addition to the house.
  • Conversion ADU: built inside existing space, such as a garage.
  • Junior ADU: up to 500 sq ft inside the house. The owner must live on the property if the Junior ADU shares a bathroom with the house.

A single-family lot can have one ADU and one Junior ADU.

Key ADU Regulations

How big can an ADU be in Montebello?

A detached ADU can be up to 1,200 sq ft. An attached ADU can be 50% of the main house, and never less than 850 sq ft, or 1,000 sq ft with more than one bedroom. A conversion can be up to 1,200 sq ft.

How tall?

A detached ADU can be 16 ft. Near major transit, or on a multifamily lot, it can be 18 ft, with 2 more feet allowed to match the roof pitch of the house. An attached ADU can be 25 ft.

Setbacks?

4 ft from the side and rear property lines. A detached ADU must sit 10 ft from other buildings on the lot, or 5 ft with a one-hour fire wall.

Parking?

One space, unless a state exemption applies, such as a conversion or a home within half a mile of public transit. Junior ADUs need none.

Permit Requirements

An ADU in Montebello needs planning review and a building permit. A typical application includes:

  • Scaled plot plan with property lines and setbacks
  • Floor plans, elevations and foundation plan
  • Title 24 energy documents

Timeline for Permits

State law gives the city 60 days to approve or deny a complete ADU application. Corrections and resubmittals add time.

Zoning and Lot Requirements

ADUs are allowed on lots with an existing or proposed home.

  • State law does not allow a minimum lot size for ADUs.
  • Garage conversions do not need replacement parking.
Get Help Navigating ADU Rules in Montebello

ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.

On this page
OverviewADU types allowedKey regulationsPermit requirementsPermit timelineZoning and lot requirementsOfficial resources
See what fits on your lot
Enter your address to check what you can build on your property.
Check your property

Our work

See more
See ADU rules for all cities
Close

Check your property

Enter your address to see your lot and the plans that may fit it.

Get your ADU now

Get Free Estimate  →