Monrovia

Monrovia ADU Rules and Requirements (2026)

Yes, you can build an ADU in Monrovia. A new ADU can be up to 1,000 square feet. A detached ADU of up to 800 square feet and 16 feet tall, set 4 feet from the side and rear property lines, gets the simplest approval path.

San Gabriel Valley
Last reviewed
November 19, 2026

At a glance

Largest detached ADU
1,000 sq ft
Height limit
16 ft
Side and rear setback
4 ft
Parking
1 space unless exempt
Permit review
60 days (state limit)

See what fits on your lot

Enter your address to find your property, explore your lot and view the plans that may fit it.

Check your property
Overview of rules in Monrovia

Monrovia reviews ADUs against written standards, with no public hearing. The rules are in Monrovia Municipal Code Section 17.44.005, which the city rewrote in 2025.

Monrovia is flexible on unit count. A single-family lot can hold a main house, a second smaller house, an ADU and a Junior ADU. The city's older neighborhoods have many historic homes, and the foothill lots north of Foothill Boulevard are in a fire hazard zone, so both design and fire rules can come into play.

ADU Types Allowed

  • Detached ADU: a new, separate building on the lot.
  • Attached ADU: an addition to the main house.
  • Conversion ADU: a garage or other existing space turned into a home, with no size limit inside the existing footprint.
  • Junior ADU: 150 to 500 square feet inside a single-family home. The owner must live on the property if the Junior ADU shares a bathroom with the house.

Key ADU Regulations

How big can an ADU be in Monrovia? Up to 1,000 sq ft for a new detached ADU. An attached ADU can be half the size of the main house or 1,000 sq ft, whichever is less. A detached ADU of 800 sq ft or less gets the simplest path. The minimum is 150 sq ft.

How tall? 16 ft for a new detached ADU. An attached ADU can be 25 ft and two stories.

Setbacks? 4 ft from the side and rear property lines.

Parking? One space at most, and none for conversions or homes within half a mile of public transit, including the Metro A Line station.

Permit Requirements

You file an ADU/JADU application with the Planning Division, then get a building permit. The city publishes a plan submittal checklist for ADUs.

Timeline for Permits

State law gives the city 60 days to approve or deny a complete ADU application. Corrections and resubmittals add time.

Zoning and Lot Requirements

Any Monrovia lot with an existing or proposed home in a zone that allows housing can have an ADU.

  • Historic homes: landmark properties and historic districts have added standards.
  • Foothills: fire zone and hillside rules apply north of Foothill Boulevard.
  • Multifamily lots can add detached ADUs and convert non-living space.
Get Help Navigating ADU Rules in Monrovia

ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.

On this page
OverviewADU types allowedKey regulationsPermit requirementsPermit timelineZoning and lot requirementsOfficial resources
See what fits on your lot
Enter your address to check what you can build on your property.
Check your property

Our work

See more
See ADU rules for all cities
Close

Check your property

Enter your address to see your lot and the plans that may fit it.

Get your ADU now

Get Free Estimate  →