Los Altos

Los Altos ADU Rules and Requirements (2026)

Yes, you can build an ADU in Los Altos. A detached ADU can be up to 1,200 sq ft and 18 ft tall, with 4 ft side and rear setbacks.

Santa Clara County
Last reviewed
November 19, 2026

At a glance

Largest detached ADU
1,200 sq ft
Height limit
18 ft
Side and rear setback
4 ft
Parking
1 space max, often waived
Permit review
60 days (state limit)

See what fits on your lot

Enter your address to find your property, explore your lot and view the plans that may fit it.

Check your property
Overview of rules in Los Altos

The City of Los Altos reviews ADU permits. The size and height figures on this page come from the city's ADU Information Guide. Cities update their ADU rules often, so confirm current figures with the city. Los Altos also publishes pre-approved ADU plan sets.

ADU Types Allowed

  • Detached ADU: a separate building on the same lot as the house.
  • Attached ADU: an addition to the house.
  • Conversion ADU: built inside the house or an accessory structure, such as a garage.
  • Junior ADU: up to 500 sq ft inside the house. The owner must live on the property if the Junior ADU shares a bathroom with the house.

A single-family lot can have one ADU and one Junior ADU.

Key ADU Regulations

How big can an ADU be in Los Altos?

A detached ADU can be up to 1,200 sq ft. An attached ADU can be up to 1,200 sq ft, but no more than 50% of the floor area of the main house.

How tall?

A detached ADU can be 18 ft. An attached ADU can be 16 ft or the height limit of the zone, whichever is greater.

Setbacks?

4 ft from the side and rear property lines. The front setback follows the zone. Conversions keep their existing setbacks.

Parking?

The city's guide lists parking as required for attached and detached ADUs, with exceptions, and none for a Junior ADU. State rule: one space at most, and none for conversions or homes within half a mile of public transit.

Permit Requirements

An ADU in Los Altos needs a building permit from the city. A typical application includes:

  • Site plan with property lines, setbacks, utilities and trees
  • Floor plans, elevations and structural details
  • Title 24 energy documents

Timeline for Permits

State law gives the city 60 days to approve or deny a complete ADU application. Corrections and resubmittals add time.

Zoning and Lot Requirements

ADUs are allowed on lots with an existing or proposed single-family or multifamily home.

  • State law does not allow a minimum lot size for ADUs.
  • Protected trees can affect where an ADU can go.
Get Help Navigating ADU Rules in Los Altos

ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.

On this page
OverviewADU types allowedKey regulationsPermit requirementsPermit timelineZoning and lot requirementsOfficial resources
See what fits on your lot
Enter your address to check what you can build on your property.
Check your property

Our work

See more
See ADU rules for all cities
Close

Check your property

Enter your address to see your lot and the plans that may fit it.

Get your ADU now

Get Free Estimate  →