Kentfield

Kentfield ADU Rules and Requirements (2026)

Yes, you can build an ADU in Kentfield. Kentfield is unincorporated, so Marin County rules apply. A detached ADU can be up to 1,200 square feet where the lot's floor area limit allows, and an ADU of up to 800 square feet and 18 feet tall, set 4 feet from the side and rear property lines, is approved by right.

Marin County
Last reviewed
November 19, 2026

At a glance

Largest detached ADU
800 to 1,200 sq ft
Height limit
18 ft
Side and rear setback
4 ft
Parking
1 space unless exempt
Permit review
60 days (state limit)

See what fits on your lot

Enter your address to find your property, explore your lot and view the plans that may fit it.

Check your property
Overview of rules in Kentfield

Kentfield has no town government. The Marin County Community Development Agency reviews ADUs here. An ADU that meets the county's written standards is approved with no public hearing.

Kentfield mixes flat lots near Corte Madera Creek with steep hillside lots. Lots near the creek are often in a flood zone, where new living space has to be raised. Hillside lots bring slope, tree and fire access questions. Next-door Ross, Larkspur and San Anselmo have their own rules.

ADU Types Allowed

  • Detached ADU: a new, separate building on the lot.
  • Attached ADU: an addition to the main house.
  • Conversion ADU: a garage or other existing space turned into a home.
  • Junior ADU: up to 500 square feet inside a single-family home. The owner must live on the property if the Junior ADU shares a bathroom with the house.

Key ADU Regulations

How big can an ADU be in Kentfield? Up to 800 sq ft by right. With an ADU permit, up to 1,200 sq ft if the lot stays within its floor area limit. Either way, 850 sq ft with one bedroom or 1,000 sq ft with two or more is allowed.

How tall? 18 ft for a by-right detached ADU, plus 2 ft to match the main roof. 25 ft for an attached ADU. Larger permitted ADUs follow the zone's standards.

Setbacks? 4 ft from the side and rear property lines for a by-right ADU. Larger permitted ADUs follow the zone's setbacks.

Parking? One space at most, and none for conversions or homes within half a mile of public transit.

Permit Requirements

You apply to the Marin County Community Development Agency. Planning checks the ADU standards, then Building and Safety reviews the construction plans. Flood zone lots need an elevation review.

Timeline for Permits

State law gives the county 60 days to approve or deny a complete ADU application. Flood, tree and slope reviews add time.

Zoning and Lot Requirements

Any Kentfield lot zoned for a house can have an ADU, as long as a legal home exists or is proposed.

  • Flood zones: lots near the creek may need raised floors.
  • Hillsides: slope, trees and fire access limit what fits.
  • The county's rules are in Development Code Section 22.32.120.
Get Help Navigating ADU Rules in Kentfield

ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.

On this page
OverviewADU types allowedKey regulationsPermit requirementsPermit timelineZoning and lot requirementsOfficial resources
See what fits on your lot
Enter your address to check what you can build on your property.
Check your property

Our work

See more
See ADU rules for all cities
Close

Check your property

Enter your address to see your lot and the plans that may fit it.

Get your ADU now

Get Free Estimate  →