Yes, you can build an ADU in Fairview. Fairview is unincorporated, so Alameda County rules apply: a new detached ADU can be up to 850 square feet with one bedroom, or 1,200 square feet with two or more, 16 feet tall, set 4 feet from the side and rear property lines.
Enter your address to find your property, explore your lot and view the plans that may fit it.
Fairview has no city government. The Alameda County Planning Department reviews ADUs here, against written rules and with no public hearing.
Fairview sits in the hills above Hayward, with larger lots, slopes and a semi-rural feel. Fewer homes here are within half a mile of transit, so plan on one parking space for a new ADU. Slopes, creeks and, on some lots, septic systems shape what can be built. Fairview also has its own local plan, so ask the county whether it affects your lot.
A single-family lot can have one ADU and one Junior ADU, plus a small detached ADU of up to 800 square feet in some cases.
How big can an ADU be in Fairview? A new detached ADU can be up to 850 sq ft with one bedroom or less, or 1,200 sq ft with two or more bedrooms, under Alameda County Ordinance 2026-1. An attached ADU is capped at half the size of the main house, or 850 sq ft with one bedroom and 1,000 sq ft with more, and 850 sq ft is always allowed. Fairview's larger hillside lots often have the area for a two-bedroom ADU, but slope and creeks decide where it can sit.
How tall? 16 ft for a new detached ADU, or 18 ft within half a mile of major transit, plus 2 ft more there to match the roof pitch of the house. An attached ADU can be 25 ft or the zone's limit, whichever is lower. No ADU can be more than two stories. On a steep lot, a split-level design can keep the ADU within 16 ft.
Setbacks? 4 ft from the side and rear property lines. A new detached ADU sits behind the main house or in the rear half of the lot, and one over 800 sq ft must be 6 ft from other buildings. Conversions keep their existing setbacks.
Parking? One space for a new ADU unless an exemption applies. Few Fairview lots are within half a mile of transit, so plan for the space. None for conversions.
You need a building permit from Alameda County. The Planning Department checks the zoning rules as part of that review. Hillside lots can need grading permits and soils reports, and lots on septic need Environmental Health sign-off.
State law gives the county 60 days to approve or deny a complete ADU application. Grading and septic reviews add time.
Any Fairview lot zoned for a house can have an ADU, as long as a legal home exists or is proposed.
ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.
ADU rules change often. This page is a general guide to help you get a sense of what may be possible where you live. It is not legal, zoning or permitting advice, it is no substitute for working with a qualified ADU professional, and it is not a promise that any project will be approved. We update these summaries as often as we can, but your city or county has the final say, and its current code always controls. Before you design, budget or build, confirm the requirements for your property with your local planning and building department.