Crockett

Crockett ADU Rules and Requirements (2026)

Yes, you can build an ADU in Crockett. Crockett is unincorporated, so Contra Costa County rules apply: a detached ADU can be up to 1,000 square feet, or 1,200 square feet on a lot of 12,000 square feet or more, set 4 feet from the side and rear property lines.

Contra Costa County
Last reviewed
November 20, 2026

At a glance

Largest detached ADU
1,000 to 1,200 sq ft
Height limit
16 ft, up to 18 ft
Side and rear setback
4 ft
Parking
1 space unless exempt
Permit review
60 days (state limit)

See what fits on your lot

Enter your address to find your property, explore your lot and view the plans that may fit it.

Check your property
Overview of rules in Crockett

Crockett has no city government. The Contra Costa County Department of Conservation and Development reviews ADUs here, against written rules and with no public hearing.

Crockett is an old hillside town on the Carquinez Strait, with small, steep lots and many homes from the early 1900s. On lots like these, the slope and the 4 ft setbacks decide what fits more than the size limit does, and lower-level or garage conversions are often the easiest route.

ADU Types Allowed

  • Detached ADU: a new, separate building on the lot.
  • Attached ADU: an addition to the main house.
  • Conversion ADU: a garage, basement or other existing space turned into a home.
  • Junior ADU: up to 500 square feet inside a single-family home. The owner must live on the property if the Junior ADU shares a bathroom with the house.

Since 2025, a single-family lot can have one conversion ADU, one detached ADU and one Junior ADU.

Key ADU Regulations

How big can an ADU be in Crockett? A detached ADU can be up to 1,000 sq ft, or 1,200 sq ft on a lot of 12,000 sq ft or more or in an agricultural district. Crockett's small hillside lots rarely reach 12,000 sq ft, so 1,000 sq ft is the usual ceiling here. An attached ADU has the same caps and is also limited to 50% of the living area of the house, but 850 sq ft with one bedroom or 1,000 sq ft with more is always allowed.

How tall? State rule: 16 ft for a detached ADU, 18 ft near major transit, and up to 25 ft for an attached ADU. An ADU that meets the zone's regular setbacks can follow the zone's height limit.

Setbacks? 4 ft from the side and rear property lines. Conversions keep their existing setbacks.

Parking? One space, unless an exemption applies, such as converting existing space or being within half a mile of public transit. Parking removed for an ADU does not have to be replaced.

Permit Requirements

You apply to the county's Department of Conservation and Development for the ADU, then for a building permit. Sloping lots can need a soils report.

Timeline for Permits

State law gives the county 60 days to approve or deny a complete ADU application. Corrections and resubmittals add time.

Zoning and Lot Requirements

Any Crockett lot zoned for a house or apartments can have an ADU, as long as a legal home exists or is proposed.

  • Steep lots: grading and foundations add cost.
  • Small lots: setbacks and existing buildings decide what fits.
  • Older homes: check that existing buildings were permitted before converting them.

Local Considerations

  • County rules. Crockett is unincorporated, so the Contra Costa County Department of Conservation and Development reviews ADUs under Chapter 82-24 of the County Ordinance Code, rewritten by Ordinance No. 2025-07 in May 2025.
  • Small, steep lots. Crockett's hillside lots rarely reach 12,000 sq ft, so 1,000 sq ft detached is the usual ceiling, and slope and setbacks often decide what fits.
  • Conversions. Lower-level and garage conversions are often the easiest route.
  • Soils reports. Sloping lots can need a soils report.
  • Older homes. Many homes date to the early 1900s, so confirm existing structures were permitted before converting them.

Frequently Asked Questions

Can I build an ADU in Crockett?

Yes. Any lot zoned for a house or apartments can have an ADU, as long as a legal home exists or is proposed.

How much does an ADU cost in Crockett?

A real number comes from the whole project, not just the structure: design and engineering, permits and fees, site work such as trenching and sewer and power connections, and finishes. Your lot usually moves the price more than the ADU itself, which is why a feasibility review comes first. In Crockett, local factors include steep-lot foundations, soils reports, and older structures that may need legalizing. See How much does an ADU cost in California? for how the pieces add up.

Is a lower-level conversion easier?

Often. It avoids new foundations on steep lots.

What if my garage was never permitted?

Check before converting. Unpermitted structures can add steps.

Is parking required for an ADU in Crockett?

One space at most, and none for conversions, Junior ADUs or homes within half a mile of public transit.

Do I have to live on the property?

Not for an ADU. Under state law since January 1, 2026, owner occupancy applies only to a Junior ADU that shares a bathroom with the house.

Get Help Navigating ADU Rules in Crockett

ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.

On this page
OverviewADU types allowedKey regulationsPermit requirementsPermit timelineZoning and lot requirementsOfficial resources
See what fits on your lot
Enter your address to check what you can build on your property.
Check your property

Our work

See more
See ADU rules for all cities
Close

Check your property

Enter your address to see your lot and the plans that may fit it.

Get your ADU now

Get Free Estimate  →