Cheviot Hills

Cheviot Hills ADU Rules and Requirements (2026)

Yes, you can build an ADU in Cheviot Hills. It is part of the City of Los Angeles, so a detached ADU can be up to 1,200 square feet and two stories, set 4 feet from the side and rear property lines.

Westside
Last reviewed
November 20, 2026

At a glance

Largest detached ADU
1,200 sq ft
Height limit
Two stories
Side and rear setback
4 ft
Parking
1 space, with exemptions
Permit review
60 days (state limit)

See what fits on your lot

Enter your address to find your property, explore your lot and view the plans that may fit it.

Check your property
Overview of rules in Cheviot Hills

Cheviot Hills follows the City of Los Angeles ADU rules. City staff review plans against the written rules, with no public hearing.

Cheviot Hills is a Westside neighborhood of 1930s and 1940s houses on rolling, curving streets around Rancho Park and the Hillcrest Country Club. Most lots are outside the city's hillside fire restriction, so the standard rules apply. The rolling terrain means some backyards step up or down from the house, which affects foundations and how a two-story ADU sits next door.

See our Los Angeles ADU rules page for the full citywide guide.

ADU Types Allowed

  • Detached ADU: a new, separate building on the lot.
  • Attached ADU: an addition to the main house.
  • Conversion ADU: a garage or other existing space turned into a home.
  • Junior ADU: up to 500 square feet inside a single-family home. The owner must live on the property if the Junior ADU shares a bathroom with the house.
  • Movable Tiny House: 150 to 430 square feet, behind the main house.

Key ADU Regulations

How big can an ADU be in Cheviot Hills? Up to 1,200 sq ft detached. An attached ADU can be up to half the size of the main house, capped at 1,200 sq ft. The lot's overall floor area limit can trim a larger ADU on a lot with a big main house, but never below 800 sq ft.

How tall? Up to two stories, within your zone's height limit. On sloping backyards, a second story can look taller from the lower neighbor, so plan windows and privacy early.

Setbacks? 4 ft from the side and rear property lines. Conversions need no added setback.

Parking? One space, but none within a half mile walk of transit or for a conversion. Lots near the E Line's Westwood/Rancho Park station usually qualify.

Permit Requirements

Permits go through the Los Angeles Department of Building and Safety (LADBS). You will need a site plan, floor plans, structural drawings and energy code documents. Sloping backyards may need a soils report for the foundation.

Timeline for Permits

State law gives Los Angeles 60 days to approve or deny a complete ADU application. Corrections and resubmittals add time.

Zoning and Lot Requirements

Any Cheviot Hills lot zoned for homes can have an ADU. There is no minimum lot size.

  • Floor area limit: a big main house can reduce a large ADU, but not below 800 sq ft.
  • Rolling lots: grade changes affect foundations and drainage.
  • Look up your lot on ZIMAS, the city's zoning map, to confirm its zone and overlays.
Get Help Navigating ADU Rules in Cheviot Hills

ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.

On this page
OverviewADU types allowedKey regulationsPermit requirementsPermit timelineZoning and lot requirementsOfficial resources
See what fits on your lot
Enter your address to check what you can build on your property.
Check your property

Our work

See more
See ADU rules for all cities
Close

Check your property

Enter your address to see your lot and the plans that may fit it.

Get your ADU now

Get Free Estimate  →