Belvedere

Belvedere ADU Rules and Requirements (2026)

Yes, you can build an ADU in Belvedere. The simplest approval path covers an ADU of up to 850 square feet, or 1,000 square feet with two bedrooms, 16 feet tall, set 4 feet from the side and rear property lines.

Marin County
Last reviewed
November 19, 2026

At a glance

Largest detached ADU
850 to 1,000 sq ft
Height limit
16 ft
Side and rear setback
4 ft
Parking
1 space unless exempt
Permit review
60 days (state limit)

See what fits on your lot

Enter your address to find your property, explore your lot and view the plans that may fit it.

Check your property
Overview of rules in Belvedere

Belvedere is its own city, not unincorporated Marin County, so the City of Belvedere reviews ADUs here. The rules are in Belvedere Municipal Code Chapter 19.79.

Belvedere is small, steep and almost fully built out, with many homes on the water. Views, slopes and narrow roads shape most projects, and conversions of existing space are often the easiest route. An ADU that goes beyond the streamlined standards can face the city's design review. Next-door Tiburon is a town with its own rules.

ADU Types Allowed

  • Detached ADU: a new, separate building on the lot.
  • Attached ADU: an addition to the main house.
  • Conversion ADU: a garage, lower level or other existing space turned into a home.
  • Junior ADU: up to 500 square feet inside a single-family home. The owner must live on the property if the Junior ADU shares a bathroom with the house.

Key ADU Regulations

How big can an ADU be in Belvedere? Up to 850 sq ft, or 1,000 sq ft with two bedrooms, on the streamlined path. Ask the city about anything larger.

How tall? 16 ft on the streamlined path.

Setbacks? 4 ft from the side and rear property lines for a new building, and the zone's normal front setback. Conversions keep their existing setbacks.

Parking? State law allows at most one space, and none for conversions, Junior ADUs or homes within half a mile of public transit. Confirm with the city for your lot.

Permit Requirements

You file the city's ADU or Junior ADU application with the Planning Department, then get a building permit.

Timeline for Permits

State law gives the city 60 days to approve or deny a complete ADU application that meets the written standards. Design review for larger projects takes longer.

Zoning and Lot Requirements

Any Belvedere lot zoned for a house with an existing or proposed home can have an ADU.

  • Steep lots: slope and soils reports are common.
  • Waterfront lots: shoreline and flood rules can apply.
  • Views: larger projects are reviewed for their effect on neighbors.
Get Help Navigating ADU Rules in Belvedere

ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.

On this page
OverviewADU types allowedKey regulationsPermit requirementsPermit timelineZoning and lot requirementsOfficial resources
See what fits on your lot
Enter your address to check what you can build on your property.
Check your property

Our work

See more
See ADU rules for all cities
Close

Check your property

Enter your address to see your lot and the plans that may fit it.

Get your ADU now

Get Free Estimate  →