Altadena

Altadena ADU Rules and Requirements (2026)

Yes, you can build an ADU in Altadena. Altadena is unincorporated, so Los Angeles County rules apply: a detached ADU can be up to 1,200 square feet and 25 feet tall, set 4 feet from the side and rear property lines.

San Gabriel Valley
Last reviewed
November 19, 2026

At a glance

Largest detached ADU
1,200 sq ft
Height limit
25 ft
Side and rear setback
4 ft
Parking
None outside fire zones
Permit review
60 days (state limit)

See what fits on your lot

Enter your address to find your property, explore your lot and view the plans that may fit it.

Check your property
Overview of rules in Altadena

Altadena has no city government. Los Angeles County Planning reviews ADUs here, against written rules and with no public hearing.

Two things are specific to Altadena. Foothill lots are in a Very High Fire Hazard Severity Zone, where the county requires two ways out to a highway and can require parking. And rebuilding after the 2025 Eaton Fire follows its own county process, so ask the county how it applies to your lot. Altadena also has its own community standards that can affect height.

ADU Types Allowed

  • Detached ADU: a new, separate building on the lot.
  • Attached ADU: an addition to the main house.
  • Conversion ADU: a garage or other existing space turned into a home.
  • Junior ADU: up to 500 square feet inside a single-family home. The owner must live on the property if the Junior ADU shares a bathroom with the house.

A single-family lot can have one ADU inside or attached to the house, one detached ADU and one Junior ADU. Size limits can be smaller when you combine them.

Key ADU Regulations

How big can an ADU be in Altadena? Up to 1,200 sq ft detached. An attached ADU can be up to half the size of the main house or 1,200 sq ft, whichever is less.

How tall? Up to 25 ft, or lower where community standards set a lower limit.

Setbacks? 4 ft from the side and rear property lines, and 6 ft between buildings. Conversions keep their existing setbacks.

Parking? None outside a Very High Fire Hazard Severity Zone. Inside one, one uncovered space unless an exemption applies.

Permit Requirements

You apply online through EPIC-LA, the county's permit system. County Planning reviews zoning first, then Building and Safety reviews the construction plans. Some lots need an oak tree permit before the ADU can be approved.

Timeline for Permits

State law gives the county 60 days to approve or deny a complete ADU application. Fire zone, tree and rebuild reviews add time.

Zoning and Lot Requirements

Any Altadena lot zoned for a house or apartments can have an ADU, as long as a legal home exists or is proposed.

  • Fire zones: in a Very High Fire Hazard Severity Zone, the lot needs two means of access to a highway, with exceptions for the smallest ADU types.
  • Community standards: Altadena's local standards can limit height.
  • Oak trees: protected trees can affect where an ADU goes.
Get Help Navigating ADU Rules in Altadena

ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.

On this page
OverviewADU types allowedKey regulationsPermit requirementsPermit timelineZoning and lot requirementsOfficial resources
See what fits on your lot
Enter your address to check what you can build on your property.
Check your property

Our work

See more
See ADU rules for all cities
Close

Check your property

Enter your address to see your lot and the plans that may fit it.

Get your ADU now

Get Free Estimate  →