Walnut Creek

Walnut Creek ADU Regulations and Building Requirements (2026)

If you're planning to build an Accessory Dwelling Unit (ADU) in Walnut Creek, understanding the city's current ADU regulations is essential. This page provides a summary of allowable ADU types, size limits, zoning rules, permitting steps, and links to official resources for further reading.

Overview of rules in Walnut Creek

The City of Walnut Creek permits ADUs in the majority of residential areas, in accordance with state ADU regulations and local ordinances. Homeowners can generally build one detached ADU and one Junior ADU (JADU) per single-family lot. Multi-family buildings may also qualify for more ADUs based on site conditions.

Walnut Creek adheres to California's general ADU law but enforces its own requirements regarding fire separation, sound insulation, and design review on a site basis.

ADU Types Allowed

  • Detached ADU: The unit is separate from the primary residence
  • Attached ADU: A unit Attached to a single-family house
  • Conversion ADU: converted from an existing structure on the property
  • Junior ADU (JADU): A small unit up to 500 sq. ft. within an existing or new single-family home, featuring an efficiency kitchen, attached to the main residence

Key ADU Regulations

  • Maximum Size:
    • Detached: 1000 square ft
    • Attached: Up to 50% of the primary home's habitable floor area, not exceeding 1,200 sq. ft
  • Setbacks:
    • Minimum 4 feet side and backyard setbacks.
  • Height Limits:
    • Maximum height 16 ft 
  • Parking Requirements:
    • Additional parking is not required if the ADU is:
      • No additional parking spaces are required for new ADU or JADU.
      • Replacement parking is not required for parking that is converted into an ADU or JADU.

Permit Requirements

To build an ADU in Walnut Creek, the following approvals are typically required:

  • Zoning and planning review: ADUs are permitted in all residential zones
  • Site plan, floor plans, and elevations: Required for permit submission to show dimensions, layout, and exterior views
  • Architectural and structural drawings: show construction details and structural integrity
  • Title 24 energy compliance documentation: Mandatory report proving compliance with CA Energy Code

Homeowners should also review Walnut Creek’s current fee schedule, utility connection requirements, and fire code compliance..

Timeline for Permits

Permit review times vary but are typically between 60 days depending on project complexity and city workload. Projects requiring corrections may take longer. Engaging professionals familiar with Walnut Creek’s ADU process can help streamline approval.

Zoning and Lot Requirements

Most residential zones are eligible for ADUs, including single-family (R-1, R-2, etc.) and multi-family zones. There are no minimum lot sizes for ADUs in Walnut Creek. Some hillside or environmentally sensitive zones may have special restrictions.

Official Resources

For the most current and complete information, refer directly to the city of Walnut Creek.

Get Help Navigating ADU Rules in Walnut Creek

ADU regulations are constantly evolving and may vary by city, county, or even neighborhood. Before starting your project, it’s always best to consult with a trained professional or certified ADU Specialist to ensure your plans align with current local requirements.

Get your ADU now

Get Free Esimate  →