ADU Basics in California: A Homeowner’s Guide

Written by
Stan Acton
Published on
December 1, 2025

Get a quick, early look at what you can build before investing in a full ADU feasibility study.

Curious about adding an accessory dwelling unit (ADU)—sometimes called a backyard home—to your property? This ADU basics guide explains what ADUs are, how they work in California, and the key steps to plan a code-compliant, livable, and value-adding home on your lot.

What Is an ADU?

An ADU (Accessory Dwelling Unit) is a secondary, self-contained home on the same lot as a primary residence. It has its own kitchen, bathroom, sleeping area, and entrance.

Common ADU types

  • Detached ADU: A separate backyard cottage.
  • Attached ADU: Shares a wall with the main home.
  • Conversion ADU: Transforms space like a garage, basement, or attic into a legal dwelling.
  • JADU (Junior ADU): A smaller, efficiency-style unit carved from existing space (has specific rules).

Why build one? Multi-generational living, space for caretakers, future flexibility, potential rental income, and long-term property value.

ADU Requirements: The Basics You Should Know

Zoning & Development Standards

Local rules shape size, height, setbacks, lot coverage, and parking. These vary by city and county, so a quick property check is the smartest first step.

Permits & Inspections

ADUs must be permitted and pass inspections (life safety, energy, and habitability). A code-compliant ADU protects your investment and resale value.

Utilities & Site Conditions

Plan early for sewer, water, and power capacity, trenching routes, and proper drainage/grading. Clear access paths and fire/life-safety requirements also matter.

Design for Real-Life Living

Prioritize livability: natural light, privacy, furniture-friendly layouts, storage, and a real kitchen. Thoughtful design makes small spaces feel big—and keeps maintenance low.

ADU Costs, Timelines & Tradeoffs (High Level)

  • Scope drives cost. Structural upgrades, utility distances, and finish selections affect budgets.
  • Timelines vary. Permitting timelines change by jurisdiction; standardized plans can help.
  • Quality matters. Durable materials and a proven process reduce change orders and delays.

(Tip: Beware of “lowest-bid” scope gaps that lead to expensive change orders later.)

Build Pathways: Which Approach Fits You?

  • Build Ready ADUs: Pre-designed, engineered plans with curated finishes and predictable timelines. Great for speed and clarity.
  • Custom ADUs: Tailored layouts and architecture for unique sites, aesthetics, or multigenerational needs.
  • Garage Conversions: Cost-effective if the structure and slab can meet habitable code; often require significant upgrades.

How an ADU Project Typically Works

  1. Property Check (Fast, Early Insight)
    Get a preliminary read on size, placement, access, and likely constraints.
    CTA: Check Your Property
  2. Feasibility Study (Site-Specific Detail)
    Verify zoning, setbacks, utilities, access, and align the program with your goals.
    CTA: Get a Free Quote
  3. Design & Engineering
    Create a plan that optimizes livability, privacy, and durability, then prepare permit-ready documents.
    CTA: Design Your Own ADU
  4. Permitting
    Submit plans, respond to comments, and secure approvals.
  5. Construction & Inspections
    Build to code with a predictable schedule, then complete final inspections and move-in.

ADU FAQs (Quick Answers)

Do I need separate utility meters?
Not always. Some cities allow shared services with sub-metering. Feasibility will determine the best, compliant setup.

What size ADU can I build?
It depends on local standards (setbacks, height, lot coverage) and your site. Many lots can support studios to two-bedroom homes with the right design.

Can I convert my garage?
Yes—if upgraded to habitable code (foundation, structure, insulation, egress, energy, fire). “Light” conversions rarely pass.

Will an ADU increase my home’s value?
A legal, well-designed ADU typically improves functionality and market appeal, supporting long-term value.

How do I keep the project on time and budget?
Start with feasibility, use standardized plans where possible, finalize selections early, and work with an experienced ADU builder.

Bottom Line: Start with the Fundamentals

A successful ADU starts with clear feasibility, livable design, and code compliance. Nail those basics, and you’ll create a flexible, lasting asset for your family and your property.

Ready to Explore ADU Possibilities on Your Lot?

  • Check Your Property – Quick, early insight for an ADU basics assessment.
  • Get a Free Quote – Understand costs and timelines for your site.
  • Design Your Own ADU – Explore layouts built for everyday living.
  • Get in Touch – Talk with California ADU builder experts today.